M I K A D O
Obrt za turizam
A. Hebranga 3
23000 Zadar
OIB: 43002653470
WhatsApp/Viber
mob: 00385 98 869 895
Ova e-mail adresa je zaštićena od spambota. Potrebno je omogućiti JavaScript da je vidite.
www.mikadotours.com
kornati-excursions-zadar.com
RBA d.d. Zagreb
HR7424840081106422436
SWIFT: RZBHHR2X
"Posljednjeg dana Stvaranja Bog je pozelio okruniti svoje djelo i stvorio je Kornate od suza, zvijezda i daha"
(George Bernard Shaw)
Zdrelac BridgeThe strait was dug during the Austro-Hungarian rule in 1883. It is known that it was 10 m (30 feet) wide and approximately 3 m (10 feet) deep. The bridge was built in 1971/72 and its length amounted to 210 m (700 feet). Simultaneously with the construction of the bridge, the strait was widened and deepened, so its width was increased to 20 m (60 feet) and its height to 16.5 m (54 feet). During the reconstruction of the bridge in 2009, three concrete pillars were replaced by an arched steel construction, which additionally widened the strait to 56 m (180 f.) and increased its height to 17 m (56 f.).
|